Vietnam project

The Vietnam Multi-Layer Shuttle Project has 5,000 cargo positions total. The finished books are packed in the boxes and each box weighs 25kg. This project is equipped with 20 double-deep multi-layer shuttle carts and 2 elevators 1500-2000 pcs/hour) and 1 set of conveyor line at the end of the shelf and the conveyor line in front of the warehouse.

image.png   image.png

Automated goods-to-person picking avoids the walking of people, significantly improves the picking efficiency of products i stock in/out, and fundamentally reduces the dependence on labor


Advantages


High speed, precise positioning

Both single depth and double depth are available

High picking speed

Specifications

4m/s Max speed

2m/s Max acceleration speed

50KG Max load

PLC Control Unit